The site of Schiffswerft Bolle around 1910
Since 1861 · Sixth generation

A company
with tradition

„Gott mit uns seit 1861

“God with us since 1861.”

These words are carved in stone on our office building. They have accompanied Schiffswerft Bolle through six generations — through every change the times have brought.

The site of Schiffswerft Bolle around 1910 The shipyard site today: aerial view of the halls on the Parey canal
One place, two centuries

The same canal. The same family.

The site of Schiffswerft Bolle around 1910
The shipyard site around 1910
The shipyard site today: aerial view of the halls on the Parey canal
The same site today — the same canal, the same family
The chronicle

From 1861 to today

Schiffswerft Gebr. Bolle
1861

The founding

The shipyard is founded on the Parey canal near Derben — at that time under the name “Schiffswerft Gebrüder Bolle”.

The location

Well placed on the water

Vessels could arrive via the Elbe-Havel canal from the direction of Berlin as well as via the Elbe. At the same time, the Parey lock protected the shipyard from the fluctuating water levels of the nearby Elbe.

Programme

Always mixed

Newbuilding, repair and conversion side by side: mostly motor cargo vessels were built — but ships for fishing in the Black Sea were launched here too.

The shipyard workforce around 1900
1972

Under the VEB

Until 1972 the shipyard remained in the private ownership of the Bolle family — then it was expropriated by the GDR and transferred into a state-owned enterprise (VEB).

1990

Reprivatisation & innovation

With the end of the GDR, the shipyard returns to family ownership in 1990. Restructuring and modernisation build on the tradition — since then 258 newbuildings have been launched.

Today

Sixth generation

Run by Mario Bolle, a graduate industrial engineer (Dipl.-Wirtsch.-Ing.), the shipyard builds today in two covered building halls with crane systems — steel construction entirely under roof through to the finished coating, plus a hall of its own for aluminium and stainless steel work. Design work is done in 3D CAD, and in 2019 the MS Schwielowsee received the Inland Navigation Innovation Award. This is how vessels with hybrid and electric propulsion are built here today.

The newbuilding register

Kept on record — number by number.

Since reprivatisation in 1990, every newbuilding has been given its hull number: name, client, dimensions, delivery. 258 newbuildings are listed in it — an unbroken line to this day.

  • No. 140Belvedere2006
  • No. 205Grand Bohemia2018
  • No. 209MS Schwielowsee2019
  • No. 239J. Hobrecht2022
  • No. 243Anna Carolina2023
Every mark a vessel — see the full overview
From the archive

Pictures of a long history

The shipyard site around 1910
The shipyard site around 1910
The shipyard workforce around 1900
The shipyard workforce around 1900
Schiffswerft Gebr. Bolle
Schiffswerft Gebr. Bolle
Parey lock
Parey lock
A newbuilding under construction
A newbuilding under construction
Employees of Schiffswerft Bolle
Employees of Schiffswerft Bolle
In the building hall
In the building hall
Shipyard workers on a break
Shipyard workers on a break
Good to know

Frequently asked questions about our history

How long has Schiffswerft Bolle been in business?

The shipyard was founded in 1861 on the Parey canal near Derben — at that time under the name “Schiffswerft Gebrüder Bolle”. Today it is run in its sixth generation by Dipl.-Wirtsch.-Ing. Mario Bolle.

What happened to the shipyard in the GDR era?

Until 1972 the shipyard remained in the private ownership of the Bolle family. It was then expropriated by the GDR and transferred into a state-owned enterprise (VEB) — in 1990, with the end of the GDR, it returned to family ownership.

How many vessels has Schiffswerft Bolle built?

Since reprivatisation in 1990, 258 newbuildings have been launched — from passenger vessels through work and government vessels to barges and pontoons. A selection is shown in the reference overview.

Why is the shipyard located in Derben?

The site on the Parey canal can be reached via the Elbe-Havel canal from the direction of Berlin and via the Elbe. At the same time, the Parey lock protects the shipyard from the fluctuating water levels of the Elbe.

What has Schiffswerft Bolle been awarded for?

For the MS Schwielowsee, one of the first hybrid passenger vessels in Germany, the shipyard received the Inland Navigation Innovation Award in 2019. Hybrid and electric propulsion has been a firm part of the building programme ever since.

Contact

Become part of the next chapter.

From the first design to the naming ceremony — tell us about your vision.